Tom Brown
1c5f471acb Include option for grid connection cost for onshore and utility PV
Only include these technologies since they are connected at new
locations.

Other technologies can fit in at existing connections.
2020-05-11 13:37:10 +02:00
Tom Brown
478832f484 Merge branch 'master' of github.com:nworbmot/pypsa-eur-sec 2020-04-29 09:53:11 +02:00
d-fine dev
a4db176458 add new link oil boiler
* prepare_sector_network:
    - add link for oil boiler in function add_industry()
    - add function for partitioning clusters into different heat node types

* config.yaml: add option for oil_boiler

* costs.csv: add costs for oil boiler
2020-04-09 14:58:03 +02:00
Tom Brown
9b326ba493 Include electricity distribution grid between load and EVs 2020-03-25 12:52:25 +01:00
Tom Brown
41f7f44dcf Make CCS optional for SMR and industry process emissions 2019-12-13 18:06:38 +01:00
Tom Brown
49a68bdd35 Separate CHP gas/solid biomass, with/without CCS
Also fix CHP p_nom_ratio constraint, and battery charger/discharger
constraint.
2019-12-12 15:03:51 +01:00
Tom Brown
3fac944e5b 191108: Include a correctly-costed H2 network
Offers same topology to optimisation for H2 grid as that of HVAC and
HVDC grid.
2019-11-26 18:00:45 +01:00
Tom Brown
886b7c5f48 Include micro-CHP using PEMFC 2019-07-28 13:10:21 +02:00
Tom Brown
71c04909b5 Allow option of underground H2 storage 2019-05-13 16:47:54 +02:00
Tom Brown
a10a7d2b15 Limit sequestration to 200 Mt/a, introduce SMR, vent stored CO2 2019-05-11 15:55:06 +02:00
Tom Brown
82a057791e Allow storing FT fuels, cost for FT conversion, fossil FT fuels
Also include raw data/costs.csv