@ -86,6 +86,7 @@ sector:
'use_fuel_cell_waste_heat' : True
'electricity_distribution_grid' : False
'electricity_distribution_grid_cost_factor' : 1.0 #multiplies cost in data/costs.csv
'electricity_grid_connection' : True # only applies to onshore wind and utility PV
costs:
year: 2030

View File

@ -242,6 +242,9 @@ HVDC inverter pair,2030,FOM,2,%/year,Hagspiel
electricity distribution grid,2030,investment,500,EUR/kW,TODO
electricity distribution grid,2030,lifetime,40,years,TODO
electricity distribution grid,2030,FOM,2,%/year,TODO
electricity grid connection,2030,investment,140,EUR/kW,DEA
electricity grid connection,2030,lifetime,40,years,TODO
electricity grid connection,2030,FOM,2,%/year,TODO
decentral oil boiler,2030,investment,156.0140915953699,EUR/kWth,Palzer thesis (https://energiesysteme-zukunft.de/fileadmin/user_upload/Publikationen/PDFs/ESYS_Materialien_Optimierungsmodell_REMod-D.pdf) (+eigene Berechnung)
decentral oil boiler,2030,lifetime,20.0,years,Palzer thesis (https://energiesysteme-zukunft.de/fileadmin/user_upload/Publikationen/PDFs/ESYS_Materialien_Optimierungsmodell_REMod-D.pdf)
decentral oil boiler,2030,FOM,2.0,%/year,Palzer thesis (https://energiesysteme-zukunft.de/fileadmin/user_upload/Publikationen/PDFs/ESYS_Materialien_Optimierungsmodell_REMod-D.pdf)

1 technology year parameter value unit source
242 electricity distribution grid 2030 investment 500 EUR/kW TODO
243 electricity distribution grid 2030 lifetime 40 years TODO
244 electricity distribution grid 2030 FOM 2 %/year TODO
245 electricity grid connection 2030 investment 140 EUR/kW DEA
246 electricity grid connection 2030 lifetime 40 years TODO
247 electricity grid connection 2030 FOM 2 %/year TODO
248 decentral oil boiler 2030 investment 156.0140915953699 EUR/kWth Palzer thesis (https://energiesysteme-zukunft.de/fileadmin/user_upload/Publikationen/PDFs/ESYS_Materialien_Optimierungsmodell_REMod-D.pdf) (+eigene Berechnung)
249 decentral oil boiler 2030 lifetime 20.0 years Palzer thesis (https://energiesysteme-zukunft.de/fileadmin/user_upload/Publikationen/PDFs/ESYS_Materialien_Optimierungsmodell_REMod-D.pdf)
250 decentral oil boiler 2030 FOM 2.0 %/year Palzer thesis (https://energiesysteme-zukunft.de/fileadmin/user_upload/Publikationen/PDFs/ESYS_Materialien_Optimierungsmodell_REMod-D.pdf)

View File

@ -608,7 +608,13 @@ def insert_electricity_distribution_grid(network):
marginal_cost=options['marginal_cost_storage'],
p_nom_extendable=True)
def add_electricity_grid_connection(network):
carriers = ["onwind","solar"]
gens = network.generators.index[network.generators.carrier.isin(carriers)]
network.generators.loc[gens,"capital_cost"] += costs.at['electricity grid connection','fixed']
def add_storage(network):
print("adding electricity storage")
@ -1623,5 +1629,7 @@ if __name__ == "__main__":
if snakemake.config["sector"]['electricity_distribution_grid']:
insert_electricity_distribution_grid(n)
if snakemake.config["sector"]['electricity_grid_connection']:
add_electricity_grid_connection(n)