* Cluster first: build renewable profiles and add all assets after clustering * [pre-commit.ci] auto fixes from pre-commit.com hooks for more information, see https://pre-commit.ci * correction: pass landfall_lengths through functions * assign landfall_lenghts correctly * remove parameter add_land_use_constraint * fix network_dict * calculate distance to shoreline, remove underwater_fraction * adjust simplification parameter to exclude Crete from offshore wind connections * [pre-commit.ci] auto fixes from pre-commit.com hooks for more information, see https://pre-commit.ci * remove unused geth2015 hydro capacities * removing remaining traces of {simpl} wildcard * add release notes and update workflow graphics * [pre-commit.ci] auto fixes from pre-commit.com hooks for more information, see https://pre-commit.ci --------- Co-authored-by: pre-commit-ci[bot] <66853113+pre-commit-ci[bot]@users.noreply.github.com> Co-authored-by: lisazeyen <lisa.zeyen@web.de>
1.8 KiB
Simplifying Electricity Networks
The simplification snakemake rules prepare approximations of the network model, for which it is computationally viable to co-optimize generation, storage and transmission capacities.
:mod:`simplify_network` transforms the transmission grid to a 380 kV only equivalent network, while
System Message: ERROR/3 (<stdin>, line 14); backlink
Unknown interpreted text role "mod".
:mod:`cluster_network` uses a k-means based clustering technique to partition the network into a given number of zones and then reduce the network to a representation with one bus per zone.
System Message: ERROR/3 (<stdin>, line 15); backlink
Unknown interpreted text role "mod".
The simplification and clustering steps are described in detail in the paper
- Jonas Hörsch and Tom Brown. The role of spatial scale in joint optimisations of generation and transmission for European highly renewable scenarios), 14th International Conference on the European Energy Market, 2017. arXiv:1705.07617, doi:10.1109/EEM.2017.7982024.
After simplification and clustering of the network, further electricity network components may be appended in the rule :mod:`add_electricity` and the network is prepared for solving in :mod:`prepare_network`.
System Message: ERROR/3 (<stdin>, line 21); backlink
Unknown interpreted text role "mod".System Message: ERROR/3 (<stdin>, line 21); backlink
Unknown interpreted text role "mod".Rule simplify_network
System Message: ERROR/3 (<stdin>, line 28)
Unknown directive type "automodule".
.. automodule:: simplify_network
Rule cluster_network
System Message: ERROR/3 (<stdin>, line 35)
Unknown directive type "automodule".
.. automodule:: cluster_network
Rule add_electricity
System Message: ERROR/3 (<stdin>, line 42)
Unknown directive type "automodule".
.. automodule:: add_electricity
Rule prepare_network
System Message: ERROR/3 (<stdin>, line 49)
Unknown directive type "automodule".
.. automodule:: prepare_network