pypsa-eur/data
Philipp Glaum a9f67b313f
handle new and upgraded TYNDP&NEP lines/links in base network (OSM compatible) (#1085)
* add general implementation to add tyndp and nep. TODO: Remove duplicate?

* pre_osm_merge

* clean and update base_network.py
update default config settings

* clean and update base_network.py
update default config settings

* base_network.py:remove adding of transmission projects
add_transmission_project.py: add new script for creating lines and link csv from transmission projects
add_electricity.py: add new projects from created csv files

* cluster_network.py: do not allow to group lines with different build years together-> requires pypsa update
simplify_network.py: fix bug of simplify links

* remove legacies of removing transmission projects from base_network

* restructure folders:new folder for tranmission project csv
add_transmission_projects: improve logging, cleanup

* update lines csvs and add default line type for upgraded and new lines

* remove duplicate lines which were already in gridkit

* allow to connect ac lines only to ac buses

* add manual links csv (adjusted links_tyndp.csv) and update default config

* add realease note

* remove links_tyndp.csv file, references in build_elec.smk and function in base_network.py to add them

* add configuration options for transmission projects to documentation and add template folder for transmission projects

* update pypsa version in environments

* [pre-commit.ci] auto fixes from pre-commit.com hooks

for more information, see https://pre-commit.ci

* integrate Fabian's review comments 2

* add electricity:add import pathlib and duplicate printing out of adding line projects

* update NEP line csv

* address Fabian's comments

* build_transmission_projects: address Fabian's final comments
simplify_network: use modus to get line type which appears most often

* build_transmission_project: change from .geometry to ["geometry"]

* build_transmission_projects: remove redundanty line

* build_transmission_projects: remove buffer for europe shape because of higher resolution
default config: fix wrong key for skip argument in transmission_projects

* update configtables and default config

* update manual links csv and delete undetected duplicate links in tyndp2020

* final adjustments

---------

Co-authored-by: pre-commit-ci[bot] <66853113+pre-commit-ci[bot]@users.noreply.github.com>
Co-authored-by: Fabian Neumann <fabian.neumann@outlook.de>
2024-08-15 11:42:21 +02:00
..
entsoegridkit Updated under_construction status of links that are commissioned by now (#1205) 2024-08-12 16:56:10 +02:00
existing_infrastructure Use powerplantmatching IRENASTAT for add_existing_baseyear 2024-04-11 12:47:13 +02:00
retro merge master 2023-06-02 16:59:06 +02:00
transmission_projects handle new and upgraded TYNDP&NEP lines/links in base network (OSM compatible) (#1085) 2024-08-15 11:42:21 +02:00
agg_p_nom_minmax.csv pre-commit formatting [no ci] 2024-05-20 15:49:40 +02:00
attributed_ports.json merge master 2023-06-02 16:59:06 +02:00
ch_cantons.csv update and reduce databundle size 2024-04-15 14:48:34 +02:00
ch_industrial_production_per_subsector.csv add ch data as csv 2024-08-07 11:49:33 +02:00
custom_extra_functionality.py add snakemake object to custom_extra_functionality arguments 2024-01-04 13:03:03 +01:00
custom_powerplants.csv custom_powerplants: correct coordinates of some UA powerplants 2024-03-08 19:16:30 +01:00
district_heat_share.csv correct indexing of DH share 2024-07-19 15:15:12 +02:00
egs_costs.json added egs costs file 2024-06-02 12:56:14 +01:00
eia_hydro_annual_capacity.csv [pre-commit.ci] auto fixes from pre-commit.com hooks 2024-03-14 13:10:23 +00:00
eia_hydro_annual_generation.csv [pre-commit.ci] auto fixes from pre-commit.com hooks 2024-03-14 13:10:23 +00:00
era5-annual-HDD-per-country.csv update data/era5-annual-{runoff,HDD}-per-country.csv 2024-03-14 12:01:57 +01:00
era5-annual-runoff-per-country.csv update data/era5-annual-{runoff,HDD}-per-country.csv 2024-03-14 12:01:57 +01:00
geth2015_hydro_capacities.csv add_electricity: Extend the assignment of max_hours 2018-11-12 22:00:46 +01:00
gr-e-11.03.02.01.01-cc.csv [pre-commit.ci] auto fixes from pre-commit.com hooks 2024-03-13 12:43:00 +00:00
heat_load_profile_BDEW.csv merge master 2023-06-02 16:59:06 +02:00
heat_load_profile.csv merge master 2023-06-02 16:59:06 +02:00
hydro_capacities.csv update and reduce databundle size 2024-04-15 14:48:34 +02:00
links_p_nom.csv Corrected Moyle Interconnector capacity in links_p_nom.csv to 500 MW (#1199) 2024-08-05 11:18:02 +02:00
nuclear_p_max_pu.csv update unit commitment parameters 2023-07-24 10:47:16 +02:00
parameter_corrections.yaml Updated under_construction status of links that are commissioned by now (#1205) 2024-08-12 16:56:10 +02:00
switzerland-new_format-all_years.csv new energy totals from eurostat 2023 report scaling JRC IDEES data from 2015 2024-02-23 13:53:28 +01:00
unit_commitment.csv update unit commitment parameters 2023-07-24 10:47:16 +02:00
urban_percent.csv merge master 2023-06-02 16:59:06 +02:00