* solve: add option for equity constraints * solve: scale more * prepare: add option to limit line/link capacity * solve: add inflow to EQ constraints * solve: reindex inflow to match load * update config files and references * add autarky option * move release notes * add spillage to equity requirements * prepare: fix accidental code removal * prepare: add country autarky option * consider snapshot_weightings for inflow * trigger CI
976 B
976 B
1 | Unit | Values | Description | |
---|---|---|---|---|
2 | types | -- | Values should specify a `line type in PyPSA <https://pypsa.readthedocs.io/en/latest/components.html#line-types>`_. Keys should specify the corresponding voltage level (e.g. 220., 300. and 380. kV) | Specifies line types to assume for the different voltage levels of the ENTSO-E grid extraction. Should normally handle voltage levels 220, 300, and 380 kV |
3 | s_max_pu | -- | Value in [0.,1.] | Correction factor for line capacities (``s_nom``) to approximate :math:`N-1` security and reserve capacity for reactive power flows |
4 | s_nom_max | MW | float | Global upper limit for the maximum capacity of each extendable line. |
5 | length_factor | -- | float | Correction factor to account for the fact that buses are *not* connected by lines through air-line distance. |
6 | under_construction | -- | One of {'zero': set capacity to zero, 'remove': remove completely, 'keep': keep with full capacity} | Specifies how to handle lines which are currently under construction. |