pypsa-eur/data/transmission_projects/nep/new_lines.csv
Philipp Glaum a9f67b313f
handle new and upgraded TYNDP&NEP lines/links in base network (OSM compatible) (#1085)
* add general implementation to add tyndp and nep. TODO: Remove duplicate?

* pre_osm_merge

* clean and update base_network.py
update default config settings

* clean and update base_network.py
update default config settings

* base_network.py:remove adding of transmission projects
add_transmission_project.py: add new script for creating lines and link csv from transmission projects
add_electricity.py: add new projects from created csv files

* cluster_network.py: do not allow to group lines with different build years together-> requires pypsa update
simplify_network.py: fix bug of simplify links

* remove legacies of removing transmission projects from base_network

* restructure folders:new folder for tranmission project csv
add_transmission_projects: improve logging, cleanup

* update lines csvs and add default line type for upgraded and new lines

* remove duplicate lines which were already in gridkit

* allow to connect ac lines only to ac buses

* add manual links csv (adjusted links_tyndp.csv) and update default config

* add realease note

* remove links_tyndp.csv file, references in build_elec.smk and function in base_network.py to add them

* add configuration options for transmission projects to documentation and add template folder for transmission projects

* update pypsa version in environments

* [pre-commit.ci] auto fixes from pre-commit.com hooks

for more information, see https://pre-commit.ci

* integrate Fabian's review comments 2

* add electricity:add import pathlib and duplicate printing out of adding line projects

* update NEP line csv

* address Fabian's comments

* build_transmission_projects: address Fabian's final comments
simplify_network: use modus to get line type which appears most often

* build_transmission_project: change from .geometry to ["geometry"]

* build_transmission_projects: remove redundanty line

* build_transmission_projects: remove buffer for europe shape because of higher resolution
default config: fix wrong key for skip argument in transmission_projects

* update configtables and default config

* update manual links csv and delete undetected duplicate links in tyndp2020

* final adjustments

---------

Co-authored-by: pre-commit-ci[bot] <66853113+pre-commit-ci[bot]@users.noreply.github.com>
Co-authored-by: Fabian Neumann <fabian.neumann@outlook.de>
2024-08-15 11:42:21 +02:00

5.7 KiB

1bus0bus1lengthv_nomnum_parallelproject_statusbuild_yeartagsx0y0x1y1type
2P43Dipperz/HessenBergrheinfeld//Bayern85380.02.0confirmed2031{"url":"https://data.netzausbau.de/2037-2023/NEP/NEP_2037_2045_Bestaetigung.pdf", "status":"confirmed", "origin":"NEP","version":2024,"location0":"Dipperz/Hessen","location1":"Bergrheinfeld//Bayern"9.80719871258119950.5411585510.181003350.0082136Al/St 490/64 4-bundle 380.0
3P71Kiel/Schleswig-HolsteinGöhl/Schleswig-Holstein85380.02.0confirmed2037{"url":"https://data.netzausbau.de/2037-2023/NEP/NEP_2037_2045_Bestaetigung.pdf", "status":"confirmed", "origin":"NEP","version":2024,"location0":"Kiel/Schleswig-Holstein","location1":"Göhl/Schleswig-Holstein"10.13555554.322708510.939963454.2861191Al/St 490/64 4-bundle 380.0
4P84HamburgSahms/Schleswig-Holstein35380.02.0confirmed2031{"url":"https://data.netzausbau.de/2037-2023/NEP/NEP_2037_2045_Bestaetigung.pdf", "status":"confirmed", "origin":"NEP","version":2024,"location0":"Hamburg","location1":"Sahms/Schleswig-Holstein"10.00065453.55034110.533129753.5252973Al/St 490/64 4-bundle 380.0
5P227Lübeck/Schleswig-HolsteinSahms/Schleswig-Holstein52380.02.0confirmed2030{"url":"https://data.netzausbau.de/2037-2023/NEP/NEP_2037_2045_Bestaetigung.pdf", "status":"confirmed", "origin":"NEP","version":2024,"location0":"Lübeck/Schleswig-Holstein","location1":"Sahms/Schleswig-Holstein"10.68473853.86644410.533129753.5252973Al/St 490/64 4-bundle 380.0
6P402Westerkappeln/Nordrhein-WestfalenGersteinwerk/Nordrhein-Westfalen89380.02.0confirmed2033{"url":"https://data.netzausbau.de/2037-2023/NEP/NEP_2037_2045_Bestaetigung.pdf", "status":"confirmed", "origin":"NEP","version":2024,"location0":"Westerkappeln/Nordrhein-Westfalen","location1":"Gersteinwerk/Nordrhein-Westfalen"7.877223752.31417167.72220788781125251.6749132Al/St 490/64 4-bundle 380.0
7P470Emden/NiedersachsenDörpen/West /Niedersachsen66380.02.0confirmed2037{"url":"https://data.netzausbau.de/2037-2023/NEP/NEP_2037_2045_Bestaetigung.pdf", "status":"confirmed", "origin":"NEP","version":2024,"location0":"Emden/Niedersachsen","location1":"Dörpen/West /Niedersachsen"7.205830453.36705417.25662264283509352.9807372Al/St 490/64 4-bundle 380.0
8P476Hochwöhrden/Schleswig-HolsteinMehlbek/Schleswig-Holstein39380.02.0confirmed2032{"url":"https://data.netzausbau.de/2037-2023/NEP/NEP_2037_2045_Bestaetigung.pdf", "status":"confirmed", "origin":"NEP","version":2024,"location0":"Hochwöhrden/Schleswig-Holstein","location1":"Mehlbek/Schleswig-Holstein"9.032396854.1586029.434653654.0045912Al/St 490/64 4-bundle 380.0
9P478Pöschendorf/Schleswig-HolsteinAlfstedt/Niedersachsen37380.02.0confirmed2037{"url":"https://data.netzausbau.de/2037-2023/NEP/NEP_2037_2045_Bestaetigung.pdf", "status":"confirmed", "origin":"NEP","version":2024,"location0":"Pöschendorf/Schleswig-Holstein","location1":"Alfstedt/Niedersachsen"9.494493154.04090419.066691553.5499782Al/St 490/64 4-bundle 380.0
10P485Herlasgrün/SachsenMarktleuthen/Bayern69380.02.0confirmed2037{"url":"https://data.netzausbau.de/2037-2023/NEP/NEP_2037_2045_Bestaetigung.pdf", "status":"confirmed", "origin":"NEP","version":2024,"location0":"Herlasgrün/Sachsen","location1":"Marktleuthen/Bayern"12.229953750.568097511.994506250.1279651Al/St 490/64 4-bundle 380.0
11P490Petersgmünd /BayernGoldshöfe /Baden-Württemberg104380.02.0confirmed2037{"url":"https://data.netzausbau.de/2037-2023/NEP/NEP_2037_2045_Bestaetigung.pdf", "status":"confirmed", "origin":"NEP","version":2024,"location0":"Petersgmünd /Bayern","location1":"Goldshöfe /Baden-Württemberg"11.025247349.18564410.127981448.8940723Al/St 490/64 4-bundle 380.0
12P540Eisfeld/ThüringenGrafenrheinfeld /Bayern126380.02.0confirmed2037{"url":"https://data.netzausbau.de/2037-2023/NEP/NEP_2037_2045_Bestaetigung.pdf", "status":"confirmed", "origin":"NEP","version":2024,"location0":"Eisfeld/Thüringen","location1":"Grafenrheinfeld /Bayern"10.90899450.426998410.196680850.0055317Al/St 490/64 4-bundle 380.0
13P625Streumen/SachsenSchmölln/Sachsen92380.02.0confirmed2035{"url":"https://data.netzausbau.de/2037-2023/NEP/NEP_2037_2045_Bestaetigung.pdf", "status":"confirmed", "origin":"NEP","version":2024,"location0":"Streumen/Sachsen","location1":"Schmölln/Sachsen"13.405404151.358276714.234700551.1244043Al/St 490/64 4-bundle 380.0
14P627Schossin/Mecklenburg-VorpommernPerleberg/Brandenburg89380.02.0confirmed2037{"url":"https://data.netzausbau.de/2037-2023/NEP/NEP_2037_2045_Bestaetigung.pdf", "status":"confirmed", "origin":"NEP","version":2024,"location0":"Schossin/Mecklenburg-Vorpommern","location1":"Perleberg/Brandenburg"11.282359353.528404311.862793353.0762716Al/St 490/64 4-bundle 380.0
15P635Grabowhöfe/Mecklenburg-VorpommernMarke/Sachsen-Anhalt280380.02.0confirmed2037{"url":"https://data.netzausbau.de/2037-2023/NEP/NEP_2037_2045_Bestaetigung.pdf", "status":"confirmed", "origin":"NEP","version":2024,"location0":"Grabowhöfe/Mecklenburg-Vorpommern","location1":"Marke/Sachsen-Anhalt"12.59417153.568305712.25245873530038851.7301547Al/St 490/64 4-bundle 380.0
16P636Delitzsch/SachsenEula/Sachsen58380.02.0confirmed2037{"url":"https://data.netzausbau.de/2037-2023/NEP/NEP_2037_2045_Bestaetigung.pdf", "status":"confirmed", "origin":"NEP","version":2024,"location0":"Delitzsch/Sachsen","location1":"Eula/Sachsen"12.34285751.525566112.513032951.1496022Al/St 490/64 4-bundle 380.0