pypsa-eur/doc/configtables/biomass.csv
cpschau f8d0efbe99
Addition of unsustainable biomass potentials (#1139)
* add columns to potential df defined by difference to eurostat

* add network components

* add unsustainable bioliquids

* replaced stores by generators, still infeasible

* remove municipal waste

* remove separate treatment of waste from biomass potential calculation

* phase out unsustainble biomass potentials

* [pre-commit.ci] auto fixes from pre-commit.com hooks

for more information, see https://pre-commit.ci

* phase-out unsustainable bioliquids

* remove waste_incineration from build_sector rule

* multiple potential calculation for different planning horizons

* raised costs of unsustainable solid biomass

* [pre-commit.ci] auto fixes from pre-commit.com hooks

for more information, see https://pre-commit.ci

* stores instead of generators

* change snakemake inputs

* add phas-eout to config

* add techcolor for unsustainable bioliquids

* add config parameter to disable inclusion of unsustainable bioenergy potentials

* [pre-commit.ci] auto fixes from pre-commit.com hooks

for more information, see https://pre-commit.ci

* add biomass to params

* remove call of snakemake object in define_spatial

* Quick resolve of review part 1 (config parameters, if-clause-reduction, bioliquid spatial, fix bioliquid link capacity

* Quick resolve of review part 2 (config table, helper function, fixed build_eurostat, removed dir-change, forced unsustainable usage, reverted overnight distinction in Snakefile)

* Cast of planning_horizon parameter to int type after test run

* added JRC fuel costs for solid and liquid biofuels, BtL VOM

* [pre-commit.ci] auto fixes from pre-commit.com hooks

for more information, see https://pre-commit.ci

* clean-up after master merge

* adressed review (increase threads for build_eurostat, fixed e_max_pu of Stores, changed version of technology-data); added release note

---------

Co-authored-by: pre-commit-ci[bot] <66853113+pre-commit-ci[bot]@users.noreply.github.com>
Co-authored-by: lisazeyen <35347358+lisazeyen@users.noreply.github.com>
2024-08-07 15:52:00 +00:00

1.1 KiB

1UnitValuesDescription
2year --{2010, 2020, 2030, 2040, 2050}Year for which to retrieve biomass potential according to the assumptions of the `JRC ENSPRESO <https://data.jrc.ec.europa.eu/dataset/74ed5a04-7d74-4807-9eab-b94774309d9f>`_ .
3scenario --{"ENS_Low", "ENS_Med", "ENS_High"}Scenario for which to retrieve biomass potential. The scenario definition can be seen in `ENSPRESO_BIOMASS <https://cidportal.jrc.ec.europa.eu/ftp/jrc-opendata/ENSPRESO/ENSPRESO_BIOMASS.xlsx>`_
4classes
5-- solid biomass--Array of biomass comodityThe comodity that are included as solid biomass
6-- not included--Array of biomass comodityThe comodity that are not included as a biomass potential
7-- biogas--Array of biomass comodityThe comodity that are included as biogas
8share_unsustainable_use_retained--Dictionary with planning horizons as keys.Share of unsustainable biomass use retained using primary production of Eurostat data as reference
9share_sustainable_potential_available--Dictionary with planning horizons as keys.Share determines phase-in of ENSPRESO biomass potentials