Cost Assumptions
|
||
|
##################
|
||
|
|
||
|
The database of cost assumptions is stored in ``data/costs.csv``.
|
||
|
|
||
|
It includes cost assumptions for all included technologies for specific
|
||
|
years from various sources, namely for
|
||
|
|
||
|
- discount rate,
|
||
|
- lifetime,
|
||
|
- investment (CAPEX),
|
||
|
- fixed operation and maintenance (FOM),
|
||
|
- variable operation and maintenance (VOM),
|
||
|
- fuel costs,
|
||
|
- efficiency, and
|
||
|
- carbon-dioxide intensity.
|
||
|
|
||
|
The given overnight capital costs are annualised to net present costs
|
||
|
with a discount rate of :math:`r` over the economic lifetime :math:`n` using the annuity factor
|
||
|
|
||
|
.. math::
|
||
|
|
||
|
a = \frac{1-(1+r)^{-n}}{r}.
|
||
|
|
||
|
Based on the parameters above the ``marginal_cost`` and ``capital_cost`` of the system components are calculated.
|
||
|
|
||
|
|
||
|
Modifying Cost Assumptions
|
||
|
==========================
|
||
|
|
||
|
Some cost assumptions (e.g. marginal cost and capital cost) can be directly overwritten in the ``config.yaml`` (cf. Section :ref:`costs_cf` in :ref:`config`).
|
||
|
|
||
|
To change cost assumptions in more detail, modify cost assumptions directly in ``data/costs.csv`` as this is not yet supported through the config file.
|
||
|
|
||
|
You can also build multiple different cost databases. Make a renamed copy of ``data/costs.csv`` (e.g. ``data/costs-optimistic.csv``) and set the variable ``COSTS=data/costs-optimistic.csv`` in the ``Snakefile``.
|
||
|
|
||
|
|
||
|
Default Cost Assumptions
|
||
|
========================
|
||
|
|
||
|
.. csv-table::
|
||
|
:header-rows: 1
|
||
|
:widths: 10,3,5,4,6,8
|
||
|
:file: ../data/costs.csv
|