################## Cost Assumptions ################## The database of cost assumptions is stored in ``data/costs.csv``. It includes cost assumptions for all included technologies for specific years from various sources, namely for - discount rate, - lifetime, - investment (CAPEX), - fixed operation and maintenance (FOM), - variable operation and maintenance (VOM), - fuel costs, - efficiency, and - carbon-dioxide intensity. The given overnight capital costs are annualised to net present costs with a discount rate of :math:`r` over the economic lifetime :math:`n` using the annuity factor .. math:: a = \frac{1-(1+r)^{-n}}{r}. Based on the parameters above the ``marginal_cost`` and ``capital_cost`` of the system components are calculated. Modifying Cost Assumptions ========================== Some cost assumptions (e.g. marginal cost and capital cost) can be directly overwritten in the ``config.yaml`` (cf. Section :ref:`costs_cf` in :ref:`config`). To change cost assumptions in more detail, modify cost assumptions directly in ``data/costs.csv`` as this is not yet supported through the config file. You can also build multiple different cost databases. Make a renamed copy of ``data/costs.csv`` (e.g. ``data/costs-optimistic.csv``) and set the variable ``COSTS=data/costs-optimistic.csv`` in the ``Snakefile``. Default Cost Assumptions ======================== .. csv-table:: :header-rows: 1 :widths: 10,3,5,4,6,8 :file: ../data/costs.csv