pypsa-eur/data/entsoegridkit
Bobby Xiong c79a9faa2c
Updated under_construction status of links that are commissioned by now (#1205)
* Updated links 14802, 14801, 12931, 14803, 14848, 14804: under_construction=False

* Updated links 14802, 14801, 14803, 14848, 14804: under_construction=False

* Updated link 8394 and parameter_corrections: Continuation of North-Sea-Link.
2024-08-12 16:56:10 +02:00
..
buses.csv update entsoe extract with missing lines 2022-01-29 14:19:59 +01:00
converters.csv update entsoe extract with missing lines 2022-01-29 14:19:59 +01:00
generators.csv update entsoe extract with missing lines 2022-01-29 14:19:59 +01:00
lines.csv linelength fix of corrupted (problem) lines 2022-02-16 21:41:13 +01:00
links.csv Updated under_construction status of links that are commissioned by now (#1205) 2024-08-12 16:56:10 +02:00
README.md update README.md 2022-03-08 12:35:00 +01:00
transformers.csv update entsoe extract with missing lines 2022-01-29 14:19:59 +01:00

Unofficial ENTSO-E dataset processed by GridKit

This dataset was generated based on a map extract from March 2022. This is an unofficial extract of the ENTSO-E interactive map of the European power system (including to a limited extent North Africa and the Middle East). The dataset has been processed by GridKit to form complete topological connections. This dataset is neither approved nor endorsed by ENTSO-E.

This dataset may be inaccurate in several ways, notably:

  • Geographical coordinates are transfered from the ENTSO-E map, which is known to choose topological clarity over geographical accuracy. Hence coordinates will not correspond exactly to reality.
  • Voltage levels are typically provided as ranges by ENTSO-E, of which the lower bound has been reported in this dataset.
  • Line structure conflicts are resolved by picking the first structure in the set
  • Transformers are not present in the original ENTSO-E dataset, their presence has been derived from the different voltages from connected lines.
  • The connection between generators and busses is derived as the geographically nearest station at the lowest voltage level. This information is again not present in the ENTSO-E dataset.

All users are advised to exercise caution in the use of this dataset. No liability is taken for inaccuracies.

Contents of dataset

This dataset is provided as set of CSV files that describe the ENTSO-E network. These files use the comma (,) as field separator, single newlines (\n) as record separator, and single quotes (') as string quote characters. The CSV files have headers.

Example code for reading the files:

# R
buses <- read.csv("buses.csv", header=TRUE, quote="'")
# python
import io, csv
class dialect(csv.excel):
    quotechar = "'"
with io.open('buses.csv', 'rb') as handle:
    buses = list(csv.DictReader(handle, dialect))

buses.csv:

Describes terminals, vertices, or 'nodes' of the system

  • bus_id: the unique identifier for the bus
  • station_id: unique identifier of its substation; a station may have multiple buses, which are typically connected by transformers
  • voltage: the operating voltage of this bus
  • dc: boolean ('t' or 'f'), describes whether the bus is a HVDC terminal (t) or a regular AC terminal (f)
  • symbol: type of station of this bus.
  • under_construction: boolean ('t' if station is currently under construction, 'f' otherwise)
  • tags: hstore encoded dictionary of 'extra' properties for this bus
  • x: longitude of its location
  • y: latitude of its location

NOTA BENE: During the processing of the network, so called 'synthetic' stations may be inserted on locations where lines are apparantly connected. Such synthetic stations can be recognised because their symbol is always joint.

lines.csv:

Buses are connected by AC-lines:

  • line_id: unique identifier for the line
  • bus0: first of the two connected buses
  • bus1: second of two connected buses
  • voltage: operating voltage of the line (identical to operating voltage of the bus)
  • circuits: number of (independent) circuits in this link, each of which typically has 3 cables.
  • length: length of line in km
  • underground: boolean, t if this is an underground cable, f for an overhead line
  • under_construction: boolean, t for lines that are currently under construction
  • tags: hstore encoded dictionary of extra properties for this link
  • geometry: extent of this line in well-known-text format (WGS84)

links.csv:

Connections between buses:

  • link_id: unique identifier for the link
  • bus0: first of the two connected buses
  • bus1: second of two connected buses
  • length: length of line in km
  • under_construction: boolean, t for lines that are currently under construction
  • tags: hstore encoded dictionary of extra properties for this link
  • geometry: extent of this line in well-known-text format (WGS84)

generators.csv

Generators attached to the network.

  • generator_id: unique identifier for the generator
  • bus_id: the bus to which this generator is connected
  • technology: type of generator
  • capacity: capacity of this generator in MW
  • tags: hstore encoded dictionary of extra attributes
  • geometry: location of generator in well-known text format (WGS84)

transformers.csv

A transformer connects buses which operate at distinct voltages. NOTA BENE: Transformers are not represented in the original dataset, but instead have been added at substations to connect AC transmission lines of distinct voltage levels.

  • transformer_id: unique identifier
  • bus0: Bus at lower voltage level bus1: Bus at higher voltage level

converters.csv

Back-to-back converters connecting non-synchronized buses.

  • converter_id: unique identifier
  • bus0: First bus bus1: Second bus