This change consists of:
- reading the final energy (FE) to thermal energy service (TES)
efficiency for each each country, seperately for gas and oil (this
efficiency represents e.g. the losses in older non-condensing
boilers)
- using TES instead of FE for the n.loads, so that it is pure energy
service instead of including losses in legacy equipment
- using the stored efficiencies for baseyear equipment in
add_existing_baseyear
In the baseyear (e.g. 2020) this should have no effect on FE, since
the reduction to TES is conpensated by the lower efficiencies of
existing equipment.
In the future (e.g. 2050) this leads to a reduction in heating demand,
since new equipment is more efficient than existing.
* prepare_sector_network.py: add oil bus whenever industry is added
* prepare_sector_network: Move added oil and methnaol buses to top of "add_industry", and add oil buses where used in "add_biomass"
* add capital cost for liquid carbonaceous fuel stores (closes#489)
* [pre-commit.ci] auto fixes from pre-commit.com hooks
for more information, see https://pre-commit.ci
---------
Co-authored-by: pre-commit-ci[bot] <66853113+pre-commit-ci[bot]@users.noreply.github.com>
* add columns to potential df defined by difference to eurostat
* add network components
* add unsustainable bioliquids
* replaced stores by generators, still infeasible
* remove municipal waste
* remove separate treatment of waste from biomass potential calculation
* phase out unsustainble biomass potentials
* [pre-commit.ci] auto fixes from pre-commit.com hooks
for more information, see https://pre-commit.ci
* phase-out unsustainable bioliquids
* remove waste_incineration from build_sector rule
* multiple potential calculation for different planning horizons
* raised costs of unsustainable solid biomass
* [pre-commit.ci] auto fixes from pre-commit.com hooks
for more information, see https://pre-commit.ci
* stores instead of generators
* change snakemake inputs
* add phas-eout to config
* add techcolor for unsustainable bioliquids
* add config parameter to disable inclusion of unsustainable bioenergy potentials
* [pre-commit.ci] auto fixes from pre-commit.com hooks
for more information, see https://pre-commit.ci
* add biomass to params
* remove call of snakemake object in define_spatial
* Quick resolve of review part 1 (config parameters, if-clause-reduction, bioliquid spatial, fix bioliquid link capacity
* Quick resolve of review part 2 (config table, helper function, fixed build_eurostat, removed dir-change, forced unsustainable usage, reverted overnight distinction in Snakefile)
* Cast of planning_horizon parameter to int type after test run
* added JRC fuel costs for solid and liquid biofuels, BtL VOM
* [pre-commit.ci] auto fixes from pre-commit.com hooks
for more information, see https://pre-commit.ci
* clean-up after master merge
* adressed review (increase threads for build_eurostat, fixed e_max_pu of Stores, changed version of technology-data); added release note
---------
Co-authored-by: pre-commit-ci[bot] <66853113+pre-commit-ci[bot]@users.noreply.github.com>
Co-authored-by: lisazeyen <35347358+lisazeyen@users.noreply.github.com>
* some small adjustments to run as single node model
* [pre-commit.ci] auto fixes from pre-commit.com hooks
for more information, see https://pre-commit.ci
---------
Co-authored-by: pre-commit-ci[bot] <66853113+pre-commit-ci[bot]@users.noreply.github.com>
* inf lifetime of gas pipelines avoids adding new links each planning horizon
* p_nom_extendable for existing gas pipelines is set false if retrofitting to H2 is not allowed
* [pre-commit.ci] auto fixes from pre-commit.com hooks
for more information, see https://pre-commit.ci
---------
Co-authored-by: pre-commit-ci[bot] <66853113+pre-commit-ci[bot]@users.noreply.github.com>