add draft HVDC projects from TYNDP 2024

This commit is contained in:
Fabian Neumann 2024-03-20 13:56:48 +01:00
parent 43884a39f8
commit c5026aaf9b
2 changed files with 16 additions and 0 deletions

View File

@ -26,3 +26,16 @@ NordBalt,Klaipeda (LT),Nybro (SE),450,,700,built,,https://en.wikipedia.org/wiki/
Estlink 1,Harku (EE),Espoo (FI),105,,350,built,,https://en.wikipedia.org/wiki/Estlink,24.560278,59.384722,24.551667,60.203889
Greenlink,Waterford (IE),Pembroke (UK),,180,500,under construction,,https://tyndp2022-project-platform.azurewebsites.net/projectsheets/transmission/286,-6.987,52.260,-4.986,51.686
Celtic Interconnector,Aghada (IE),La Martyre (FR),,572,700,under consideration,,https://tyndp2022-project-platform.azurewebsites.net/projectsheets/transmission/107,-8.16642,51.91413,-4.184,48.459
GiLA,Bordeaux (FR),Nantes (FR),,312,640,under consideration,,https://eepublicdownloads.blob.core.windows.net/public-cdn-container/tyndp-documents/TYNDP2024/240220_TYNDP2024_project_portfolio.xlsx,-1.209,46.901,-0.576,44.960
HG North Tyrrhenian Corridor,Milan (IT),Viterbo (IT),,500,2000,in permitting,,https://eepublicdownloads.blob.core.windows.net/public-cdn-container/tyndp-documents/TYNDP2024/240220_TYNDP2024_project_portfolio.xlsx,9.409,45.553,12.015,42.244
HG Adriatic Corridor,Ferrara (IT),Foggia (IT),,582,2000,in permitting,,https://eepublicdownloads.blob.core.windows.net/public-cdn-container/tyndp-documents/TYNDP2024/240220_TYNDP2024_project_portfolio.xlsx,11.661,44.855,15.550,41.513
SAPEI 2,Fioumesanto (IT),Montalto (IT),,390,1000,in permitting,,https://eepublicdownloads.blob.core.windows.net/public-cdn-container/tyndp-documents/TYNDP2024/240220_TYNDP2024_project_portfolio.xlsx,8.283,40.790,11.602,42.331
HG Ionian-Tyrrhenian Corridor,Rossano (IT),Latina (IT),,496,2000,in permitting,,https://eepublicdownloads.blob.core.windows.net/public-cdn-container/tyndp-documents/TYNDP2024/240220_TYNDP2024_project_portfolio.xlsx,16.629,39.568,12.779,41.430
HG Ionian-Tyrrhenian Corridor 2,Rossano (IT),Catania (IT),,330,2000,in permitting,,https://eepublicdownloads.blob.core.windows.net/public-cdn-container/tyndp-documents/TYNDP2024/240220_TYNDP2024_project_portfolio.xlsx,16.629,39.568,15.049,37.408
Germany-UK Hybrid Interconnector,Fetteresso (UK),Emden (DE),800,,2000,under consideration,,https://eepublicdownloads.blob.core.windows.net/public-cdn-container/tyndp-documents/TYNDP2024/240220_TYNDP2024_project_portfolio.xlsx,-2.383,56.991,7.207,53.376
NU-Link Interconnector,Hornsea (UK),Moerdijk (NL),,460,1200,under consideration,,https://eepublicdownloads.blob.core.windows.net/public-cdn-container/tyndp-documents/TYNDP2024/240220_TYNDP2024_project_portfolio.xlsx,-0.261,53.655,4.586,51.661
APOLLO-LINK,La Farga (ES),La Spezia (IT),,725,2091,under consideration,,https://eepublicdownloads.blob.core.windows.net/public-cdn-container/tyndp-documents/TYNDP2024/240220_TYNDP2024_project_portfolio.xlsx,2.883,42.062,9.884,44.107
Baltic WindConnector (BWC),Lubmin (DE),Lihula (EE),,960,2000,under consideration,,https://eepublicdownloads.blob.core.windows.net/public-cdn-container/tyndp-documents/TYNDP2024/240220_TYNDP2024_project_portfolio.xlsx,13.686,54.139,23.818,58.675
High-Voltage Direct Current Interconnector Project Romania-Hungary,Constanta (RO),Albertirsa (HU),,930,2500,under consideration,,https://eepublicdownloads.blob.core.windows.net/public-cdn-container/tyndp-documents/TYNDP2024/240220_TYNDP2024_project_portfolio.xlsx,28.588,44.201,19.584,47.224
Rhine-Main-Link,Ovelgönne (DE),Marxheim (DE),,433,4000,in permitting,,https://eepublicdownloads.blob.core.windows.net/public-cdn-container/tyndp-documents/TYNDP2024/240220_TYNDP2024_project_portfolio.xlsx,8.379,53.315,8.435,50.078
Green Aegean Interconnector,Arachthos (GR),Ottenhofen (DE),,600,3000,under consideration,,https://eepublicdownloads.blob.core.windows.net/public-cdn-container/tyndp-documents/TYNDP2024/240220_TYNDP2024_project_portfolio.xlsx,20.967,39.185,11.868,48.207

1 Name Converterstation 1 Converterstation 2 Length (given) (km) Length (distance*1.2) (km) Power (MW) status replaces Ref x1 y1 x2 y2
26 Estlink 1 Harku (EE) Espoo (FI) 105 350 built https://en.wikipedia.org/wiki/Estlink 24.560278 59.384722 24.551667 60.203889
27 Greenlink Waterford (IE) Pembroke (UK) 180 500 under construction https://tyndp2022-project-platform.azurewebsites.net/projectsheets/transmission/286 -6.987 52.260 -4.986 51.686
28 Celtic Interconnector Aghada (IE) La Martyre (FR) 572 700 under consideration https://tyndp2022-project-platform.azurewebsites.net/projectsheets/transmission/107 -8.16642 51.91413 -4.184 48.459
29 GiLA Bordeaux (FR) Nantes (FR) 312 640 under consideration https://eepublicdownloads.blob.core.windows.net/public-cdn-container/tyndp-documents/TYNDP2024/240220_TYNDP2024_project_portfolio.xlsx -1.209 46.901 -0.576 44.960
30 HG North Tyrrhenian Corridor Milan (IT) Viterbo (IT) 500 2000 in permitting https://eepublicdownloads.blob.core.windows.net/public-cdn-container/tyndp-documents/TYNDP2024/240220_TYNDP2024_project_portfolio.xlsx 9.409 45.553 12.015 42.244
31 HG Adriatic Corridor Ferrara (IT) Foggia (IT) 582 2000 in permitting https://eepublicdownloads.blob.core.windows.net/public-cdn-container/tyndp-documents/TYNDP2024/240220_TYNDP2024_project_portfolio.xlsx 11.661 44.855 15.550 41.513
32 SAPEI 2 Fioumesanto (IT) Montalto (IT) 390 1000 in permitting https://eepublicdownloads.blob.core.windows.net/public-cdn-container/tyndp-documents/TYNDP2024/240220_TYNDP2024_project_portfolio.xlsx 8.283 40.790 11.602 42.331
33 HG Ionian-Tyrrhenian Corridor Rossano (IT) Latina (IT) 496 2000 in permitting https://eepublicdownloads.blob.core.windows.net/public-cdn-container/tyndp-documents/TYNDP2024/240220_TYNDP2024_project_portfolio.xlsx 16.629 39.568 12.779 41.430
34 HG Ionian-Tyrrhenian Corridor 2 Rossano (IT) Catania (IT) 330 2000 in permitting https://eepublicdownloads.blob.core.windows.net/public-cdn-container/tyndp-documents/TYNDP2024/240220_TYNDP2024_project_portfolio.xlsx 16.629 39.568 15.049 37.408
35 Germany-UK Hybrid Interconnector Fetteresso (UK) Emden (DE) 800 2000 under consideration https://eepublicdownloads.blob.core.windows.net/public-cdn-container/tyndp-documents/TYNDP2024/240220_TYNDP2024_project_portfolio.xlsx -2.383 56.991 7.207 53.376
36 NU-Link Interconnector Hornsea (UK) Moerdijk (NL) 460 1200 under consideration https://eepublicdownloads.blob.core.windows.net/public-cdn-container/tyndp-documents/TYNDP2024/240220_TYNDP2024_project_portfolio.xlsx -0.261 53.655 4.586 51.661
37 APOLLO-LINK La Farga (ES) La Spezia (IT) 725 2091 under consideration https://eepublicdownloads.blob.core.windows.net/public-cdn-container/tyndp-documents/TYNDP2024/240220_TYNDP2024_project_portfolio.xlsx 2.883 42.062 9.884 44.107
38 Baltic WindConnector (BWC) Lubmin (DE) Lihula (EE) 960 2000 under consideration https://eepublicdownloads.blob.core.windows.net/public-cdn-container/tyndp-documents/TYNDP2024/240220_TYNDP2024_project_portfolio.xlsx 13.686 54.139 23.818 58.675
39 High-Voltage Direct Current Interconnector Project Romania-Hungary Constanta (RO) Albertirsa (HU) 930 2500 under consideration https://eepublicdownloads.blob.core.windows.net/public-cdn-container/tyndp-documents/TYNDP2024/240220_TYNDP2024_project_portfolio.xlsx 28.588 44.201 19.584 47.224
40 Rhine-Main-Link Ovelgönne (DE) Marxheim (DE) 433 4000 in permitting https://eepublicdownloads.blob.core.windows.net/public-cdn-container/tyndp-documents/TYNDP2024/240220_TYNDP2024_project_portfolio.xlsx 8.379 53.315 8.435 50.078
41 Green Aegean Interconnector Arachthos (GR) Ottenhofen (DE) 600 3000 under consideration https://eepublicdownloads.blob.core.windows.net/public-cdn-container/tyndp-documents/TYNDP2024/240220_TYNDP2024_project_portfolio.xlsx 20.967 39.185 11.868 48.207

View File

@ -59,6 +59,9 @@ Upcoming Release
* Removed rule ``copy_config``. Instead, a config file is created for each
network output of the ``solve_*`` rules, with the same content as ``n.meta``.
* Added new HVDC transmission projects from `TYNDP 2024 draft projects
<https://tyndp.entsoe.eu/news/176-pan-european-electricity-transmission-projects-and-33-storage-projects-will-be-assessed-in-tyndp-2024>`_.
* Upgrade to Snakemake v8.5+. This version is the new minimum version required.
To upgrade an existing environment, run ``conda install -c bioconda
snakemake-minimal">=8.5"`` and ``pip install snakemake-storage-plugin-http``