add image to release notes

This commit is contained in:
Fabian Neumann 2022-03-17 18:16:18 +01:00
parent 480d252cb4
commit b30c559537
2 changed files with 4 additions and 1 deletions

BIN
doc/img/synchronisation.png Normal file

Binary file not shown.

After

Width:  |  Height:  |  Size: 648 KiB

View File

@ -8,13 +8,16 @@ Release Notes
########################################## ##########################################
Synchronisation Release - Ukraine and Moldova (17th March 2022) Synchronisation Release - Ukraine and Moldova (17th March 2022)
=================================================================== ===============================================================
On March 16, 2022, the transmission networks of Ukraine and Moldova have On March 16, 2022, the transmission networks of Ukraine and Moldova have
successfully been `synchronised with the continental European grid <https://www.entsoe.eu/news/2022/03/16/continental-europe-successful-synchronisation-with-ukraine-and-moldova-power-systems/>`_. We have taken successfully been `synchronised with the continental European grid <https://www.entsoe.eu/news/2022/03/16/continental-europe-successful-synchronisation-with-ukraine-and-moldova-power-systems/>`_. We have taken
this as an opportunity to add the power systems of Ukraine and Moldova to this as an opportunity to add the power systems of Ukraine and Moldova to
PyPSA-Eur. This includes: PyPSA-Eur. This includes:
.. image:: img/synchronisation.png
:width: 500
* the transmission network topology from the `ENTSO-E interactive map <https://www.entsoe.eu/data/map/>`_. * the transmission network topology from the `ENTSO-E interactive map <https://www.entsoe.eu/data/map/>`_.
* existing power plants (incl. nuclear, coal, gas and hydro) from the `powerplantmatching <https://github.com/fresna/powerplantmatching>`_ tool * existing power plants (incl. nuclear, coal, gas and hydro) from the `powerplantmatching <https://github.com/fresna/powerplantmatching>`_ tool