Learning Energy System Modelling
|
||||
================================
|
||||
|
||||
If you are (relatively) new to energy system modelling and optimisation
|
||||
and plan to use PyPSA-Eur, the following resources are *one way* to get started
|
||||
in addition to reading this documentation.
|
||||
|
||||
- Documentation of `PyPSA <https://pypsa.readthedocs.io>`_, the package for
|
||||
simulating and optimising modern power systems which PyPSA-Eur uses under the hood.
|
||||
- Course on `Energy System Modelling <https://nworbmot.org/courses/esm-2019/>`_,
|
||||
Karlsruhe Institute of Technology (KIT), `Dr. Tom Brown <https://nworbmot.org>`_
|
||||
|
||||
Citing PyPSA-Eur
|
||||
================
|
||||
|
53
doc/limitations.rst
Normal file
53
doc/limitations.rst
Normal file
@ -0,0 +1,53 @@
|
||||
##########################################
|
||||
Limitations
|
||||
##########################################
|
||||
|
||||
|
||||
While the benefit of an openly available, functional and partially validated
|
||||
model of the European transmission system is high, many approximations have
|
||||
been made due to missing data.
|
||||
The limitations of the dataset are listed below,
|
||||
both as a warning to the user and as an encouragement to assist in
|
||||
improving the approximations.
|
||||
|
||||
- **Network topology:**
|
||||
The grid data is based on a map of the ENTSO-E area that is known
|
||||
to contain small distortions to improve readability. Since the exact impedances
|
||||
of the lines are unknown, approximations based on line lengths and standard
|
||||
line parameters were made that ignore specific conductoring choices for
|
||||
particular lines. There is no openly available data on busbar configurations, switch
|
||||
locations, transformers or reactive power compensation assets.
|
||||
|
||||
- **Distribution networks:**
|
||||
Using Voronoi cells to aggregate load and generator data to transmission
|
||||
network substations ignores the topology of the underlying distribution network,
|
||||
meaning that assets may be connected to the wrong substation.
|
||||
|
||||
- **Power Demand:**
|
||||
Assumptions
|
||||
have been made about the distribution of load in each country proportional to
|
||||
population and GDP that may not reflect local circumstances.
|
||||
Openly available
|
||||
data on load time series may not correspond to the true vertical load and is
|
||||
not spatially disaggregated; assuming, as we have done, that the load time series
|
||||
shape is the same at each node within each country ignores local differences.
|
||||
|
||||
- **Currently installed renewable capacities:**
|
||||
Information on existing wind, solar and small hydro, geothermal, marine and
|
||||
biomass power plants are excluded from the dataset because of a lack of data
|
||||
availability in many countries. Approximate distributions of wind and solar
|
||||
plants in each country can be generated that are proportional to the capacity
|
||||
factor at each location.
|
||||
|
||||
- **Hydro-electric power plants:**
|
||||
The database of hydro-electric power plants does not include plant-specific
|
||||
energy storage information, so that blanket values based on country storage
|
||||
totals have been used. Inflow time series are based on country-wide approxima-
|
||||
tions, ignoring local topography and basin drainage; in principle a full hydro-
|
||||
logical model should be used.
|
||||
|
||||
- **International interactions:**
|
||||
Border connections and power flows to Russia,
|
||||
Belarus, Ukraine, Turkey and Morocco have not been taken into account; is-
|
||||
lands which are not connected to the main European system, such as Malta,
|
||||
Crete and Cyprus, are also excluded from the model.
|