Include also industry new electricity load at low voltage bus
For consistency with the existing industry electricity load already there. This only applies when the electricity distribution grid is inserted.
This commit is contained in:
parent
06a3b029d8
commit
ac4100922a
@ -655,7 +655,8 @@ def insert_electricity_distribution_grid(network):
|
||||
lifetime=costs.at['electricity distribution grid','lifetime'],
|
||||
capital_cost=costs.at['electricity distribution grid','fixed']*snakemake.config["sector"]['electricity_distribution_grid_cost_factor'])
|
||||
|
||||
loads = network.loads.index[network.loads.carrier=="electricity"]
|
||||
#this catches regular electricity load and "industry new electricity"
|
||||
loads = network.loads.index[network.loads.carrier.str.contains("electricity")]
|
||||
network.loads.loc[loads,"bus"] += " low voltage"
|
||||
|
||||
bevs = network.links.index[network.links.carrier == "BEV charger"]
|
||||
|
Loading…
Reference in New Issue
Block a user