do not cluster conventional gens, fix CO2 limit

This commit is contained in:
Fabian 2023-04-27 09:39:52 +02:00
parent 94d41b262a
commit 9b39cdff53

View File

@ -24,13 +24,13 @@ scenario:
ll: # allowed transmission line volume expansion, can be any float >= 1.0 with a prefix v|c (today) or "copt"
- v1.0
clusters: # number of nodes in Europe, any integer between 37 (1 node per country-zone) and several hundred
- 37
- "37m"
# - 128
# - 256
# - 512
# - 1024
opts: # only relevant for PyPSA-Eur
- ''
- 'Co2L'
sector_opts: # this is where the main scenario settings are
- Co2L0-3H-T-H-B-I-A-solar+p3-dist1
# to really understand the options here, look in scripts/prepare_sector_network.py
@ -91,7 +91,7 @@ co2_budget:
electricity:
voltages: [220., 300., 380.]
gaslimit: false # global gas usage limit of X MWh_th
co2limit: 1e9
co2limit: 1.0e+9
co2base: 1.487e+9
agg_p_nom_limits: data/agg_p_nom_minmax.csv
@ -334,7 +334,7 @@ solar_thermal:
# only relevant for foresight = myopic or perfect
existing_capacities:
unit_commitment: true # if unit commitment (UC) for conventional power plants is used
unit_commitment: false # if unit commitment (UC) for conventional power plants is used
# UC is only applied to extendable plants if linearized UC is used
grouping_years_power: [1980, 1985, 1990, 1995, 2000, 2005, 2010, 2015, 2020, 2025, 2030]
grouping_years_heat: [1980, 1985, 1990, 1995, 2000, 2005, 2010, 2015, 2019] # these should not extend 2020
@ -584,7 +584,7 @@ costs:
battery: 0.
battery inverter: 0.
emission_prices: # in currency per tonne emission, only used with the option Ep
co2: 0.
co2: 25 # TODO: make this dynamic per month
clustering:
simplify_network: