solve_network: reinsert docstring
This commit is contained in:
parent
30b8bb3c94
commit
5fe4032e47
@ -3,9 +3,72 @@
|
|||||||
#
|
#
|
||||||
# SPDX-License-Identifier: MIT
|
# SPDX-License-Identifier: MIT
|
||||||
"""
|
"""
|
||||||
Solves sector-coupled network.
|
Solves optimal operation and capacity for a network with the option to
|
||||||
"""
|
iteratively optimize while updating line reactances.
|
||||||
|
|
||||||
|
This script is used for optimizing the electrical network as well as the
|
||||||
|
sector coupled network.
|
||||||
|
|
||||||
|
Relevant Settings
|
||||||
|
-----------------
|
||||||
|
.. code:: yaml
|
||||||
|
solving:
|
||||||
|
options:
|
||||||
|
formulation:
|
||||||
|
clip_p_max_pu:
|
||||||
|
load_shedding:
|
||||||
|
noisy_costs:
|
||||||
|
nhours:
|
||||||
|
min_iterations:
|
||||||
|
max_iterations:
|
||||||
|
skip_iterations:
|
||||||
|
track_iterations:
|
||||||
|
solver:
|
||||||
|
name:
|
||||||
|
options:
|
||||||
|
|
||||||
|
.. seealso::
|
||||||
|
Documentation of the configuration file ``config.yaml`` at
|
||||||
|
:ref:`electricity_cf`, :ref:`solving_cf`, :ref:`plotting_cf`
|
||||||
|
|
||||||
|
Inputs
|
||||||
|
------
|
||||||
|
- ``networks/elec_s{simpl}_{clusters}_ec_l{ll}_{opts}.nc``: confer :ref:`prepare`
|
||||||
|
|
||||||
|
Outputs
|
||||||
|
-------
|
||||||
|
- ``results/networks/elec_s{simpl}_{clusters}_ec_l{ll}_{opts}.nc``: Solved PyPSA network including optimisation results
|
||||||
|
.. image:: ../img/results.png
|
||||||
|
:scale: 40 %
|
||||||
|
|
||||||
|
Description
|
||||||
|
-----------
|
||||||
|
Total annual system costs are minimised with PyPSA. The full formulation of the
|
||||||
|
linear optimal power flow (plus investment planning
|
||||||
|
is provided in the
|
||||||
|
`documentation of PyPSA <https://pypsa.readthedocs.io/en/latest/optimal_power_flow.html#linear-optimal-power-flow>`_.
|
||||||
|
The optimization is based on the ``pyomo=False`` setting in the :func:`network.lopf` and :func:`pypsa.linopf.ilopf` function.
|
||||||
|
Additionally, some extra constraints specified in :mod:`prepare_network` are added.
|
||||||
|
Solving the network in multiple iterations is motivated through the dependence of transmission line capacities and impedances.
|
||||||
|
As lines are expanded their electrical parameters change, which renders the optimisation bilinear even if the power flow
|
||||||
|
equations are linearized.
|
||||||
|
To retain the computational advantage of continuous linear programming, a sequential linear programming technique
|
||||||
|
is used, where in between iterations the line impedances are updated.
|
||||||
|
Details (and errors made through this heuristic) are discussed in the paper
|
||||||
|
|
||||||
|
- Fabian Neumann and Tom Brown. `Heuristics for Transmission Expansion Planning in Low-Carbon Energy System Models <https://arxiv.org/abs/1907.10548>`_), *16th International Conference on the European Energy Market*, 2019. `arXiv:1907.10548 <https://arxiv.org/abs/1907.10548>`_.
|
||||||
|
|
||||||
|
.. warning::
|
||||||
|
Capital costs of existing network components are not included in the objective function,
|
||||||
|
since for the optimisation problem they are just a constant term (no influence on optimal result).
|
||||||
|
Therefore, these capital costs are not included in ``network.objective``!
|
||||||
|
If you want to calculate the full total annual system costs add these to the objective value.
|
||||||
|
|
||||||
|
.. tip::
|
||||||
|
The rule :mod:`solve_all_networks` runs
|
||||||
|
for all ``scenario`` s in the configuration file
|
||||||
|
the rule :mod:`solve_network`.
|
||||||
|
"""
|
||||||
import logging
|
import logging
|
||||||
import re
|
import re
|
||||||
|
|
||||||
|