avoid duplicate existing RES capacities (closes #1016)
This commit is contained in:
parent
a0e968e573
commit
5397f3fe85
@ -29,7 +29,7 @@ conventional_carriers,--,"Any subset of {nuclear, oil, OCGT, CCGT, coal, lignite
|
||||
,,,
|
||||
renewable_carriers,--,"Any subset of {solar, onwind, offwind-ac, offwind-dc, offwind-float, hydro}",List of renewable generators to include in the model.
|
||||
estimate_renewable_capacities,,,
|
||||
-- enable,,bool,Activate routine to estimate renewable capacities
|
||||
-- enable,,bool,Activate routine to estimate renewable capacities in rule :mod:`add_electricity`. This option should not be used in combination with pathway planning ``foresight: myopic`` or ``foresight: perfect`` as renewable capacities are added differently in :mod:`add_existing_baseyear`.
|
||||
-- from_opsd,--,bool,Add renewable capacities from `OPSD database <https://data.open-power-system-data.org/renewable_power_plants/2020-08-25>`_. The value is depreciated but still can be used.
|
||||
-- year,--,bool,Renewable capacities are based on existing capacities reported by IRENA (IRENASTAT) for the specified year
|
||||
-- expansion_limit,--,float or false,"Artificially limit maximum IRENA capacities to a factor. For example, an ``expansion_limit: 1.1`` means 110% of capacities . If false are chosen, the estimated renewable potentials determine by the workflow are used."
|
||||
|
Can't render this file because it has a wrong number of fields in line 5.
|
@ -10,6 +10,13 @@ Release Notes
|
||||
Upcoming Release
|
||||
================
|
||||
|
||||
* Bugfix: The configuration setting ``electricity:
|
||||
estimate_renewable_capacities: enable:`` for rule :mod:`add_electricity` is
|
||||
not compatible with ``foresight: myopic``, as the former adds existing
|
||||
renewable capacities in a different way in :mod:`add_existing_baseyear`.
|
||||
The logic was changed so that adding existing renewable capacities is now
|
||||
skipped in :mod:`add_electricity` if the foresight mode is ``myopic``.
|
||||
|
||||
* Bugfix: Make sure that gas-fired power plants are correctly added as OCGT or
|
||||
CCGT in :mod:`add_electricity`. Previously they were always added as OCGT.
|
||||
|
||||
|
@ -385,6 +385,7 @@ rule add_electricity:
|
||||
electricity=config_provider("electricity"),
|
||||
conventional=config_provider("conventional"),
|
||||
costs=config_provider("costs"),
|
||||
foresight=config_provider("foresight"),
|
||||
drop_leap_day=config_provider("enable", "drop_leap_day"),
|
||||
input:
|
||||
unpack(input_profile_tech),
|
||||
|
@ -881,12 +881,19 @@ if __name__ == "__main__":
|
||||
|
||||
estimate_renewable_caps = params.electricity["estimate_renewable_capacities"]
|
||||
if estimate_renewable_caps["enable"]:
|
||||
if params.foresight != "overnight":
|
||||
logger.info(
|
||||
"Skipping renewable capacity estimation because they are added later "
|
||||
"in rule `add_existing_baseyear` with foresight mode 'myopic'."
|
||||
)
|
||||
else:
|
||||
tech_map = estimate_renewable_caps["technology_mapping"]
|
||||
expansion_limit = estimate_renewable_caps["expansion_limit"]
|
||||
year = estimate_renewable_caps["year"]
|
||||
|
||||
if estimate_renewable_caps["from_opsd"]:
|
||||
attach_OPSD_renewables(n, tech_map)
|
||||
|
||||
estimate_renewable_capacities(
|
||||
n, year, tech_map, expansion_limit, params.countries
|
||||
)
|
||||
|