Name;Converter;Converter2;Total Length (Cable/Pole);Volt (kV);Power (MW);Year;Type;Remarks;Ref ;;;;;;;;; EuroAsia Interconnector;Israel via Cyprus and Crete;Greece -Attica;1520;600;2000;2022;;;[112][113] Viking Link;Denmark - Revsing;UK - Bicker Fen;740;;1000-1400;2022;;;[116][117] NSN Link;Norway -Kvilldal;England -Blyth;730;515;1400;2020;IGBT;Supplier:ABB, Prysmian Group, Nexans;[102][103][104][105] NorthConnect;Norway - Simadalen;UK -Peterhead;650;;1400;2022;;;[114][115] NORD.LINK;Norway - Tonstad58.39_29_N 6.43_29_E;Germany - Wilster53.55_18_N 9.20_41_E;623;525;1400;2020;Thyr;Supplier: ABB;[99][100][101] ;;;(570/53);;;;;; NorNed;Netherlands - Eemshaven53.26_4_N 6.51_57_E;Norway - Feda58.16_58_N 6.51_55_E;580;450;700;2008;Thyr;Supplier:ABB,Nexans;[38] ;;;(580/0);;;;;; SACOI 1;Italy - Suvereto43.3_10_N 10.41_42_E;"France- Lucciana42.31_40_N 9.26_59_E; Codrongianos, Italy40.39_7_N 8.42_48_E";483;200;200;1965;Merc;Replaced in 1986 by Thyr, multiterminal scheme;[1] ;;;(365/118);;;;;; Volgograd-Donbass;Russia - Volzhskaya48.49_34_N 44.40_20_E;Ukraine - Mikhailovskaya48.39_13_N 38.33_56_E;475;400;750;1965;Merc/Thyr;Shut down in 2014;[1] ;;;(0/475);;;;;; NordBalt;Sweden - Nybro56.46_1_N 15.51_35_E;Lithuania - Klaip_da55.40_54_N 21.15_29_E;450;300;700;2015;IGBT;Supplier:ABB;[66] ;;;(450/0);;;;;; SAPEI;Italy - Latina41.25_47_N 12.48_25_E;Italy - Fiume Santo40.50_29_N 8.18_21_E;435;500;1000;2011;Thyr;The largest HVDC link in the Mediterranean Sea. Supplier:ABB;[38][42][43] ;;;(435/0);;;;;; SACOI2;Italy - Suvereto43.3_10_N 10.41_42_E;"France- Lucciana42.31_40_N 9.26_59_E; Codrongianos, Italy40.39_7_N 8.42_48_E";422;200;300;1992;Thyr;Multiterminal scheme; ;;;(118/304);;;;;Supplier:Alstom; Western HVDC Link;UK -Hunterston;UK -Flintshire Bridge;422;600;2200;2017-18;Thyr;Supplier:Prysmian Group,Siemens;[80][81] ;;;(422/0);;;;;First subsea 600kV link; HVDC MON.ITA Project;Italy-Cepagatti42.24_11_N 14.7_46_E;Montenegro -Lastva Grbaljska42.18_53_N 18.47_35_E;415;500;1000;2017;IGBT;"Supplier:Toshiba(converter stations);Nexans(cables).";[77][78][79] ;;;(415/0);;;;;; Shetland HVDC Connection;UK - UpperKergord;UK - nearStaxigoe[108];345;300;550/600;20216;Thyr;;[109][110] ;;;(345/0);;;;;; COBRAcable;Denmark - Endrup viaFan;Nederlands -Eemshaven;325;400;700;20194;;;[84][85][86] Italy-Greece;Greece - Arachthos39.11_00_N 20.57_48_E;Italy - Galatina40.9_53_N 18.7_49_E;310;400;500;2001;Thyr;; ;;;(200/110);;;;;; Eastern HVDC Link;UK -Peterhead;UK -Hawthorn;305;400;2000;2024;;;[118] Fenno-Skan2;Finland - Rauma61.09_07_N 21.37_32_E;Sweden - Finnbole60.25_30_N 17.3_42_E;303;500;800;2011;Thyr;; ;;;(200/103);;;;;; Valhall HVDC;Norway - Lista58.04_37_N 6.46_29_E;Norway - Valhall, Offshore platform;292;150;78;2011;IGBT;Supplier:ABB,Nexans;[44][45] ;;;(292/0);;;;;; Baltic Cable;Germany - Lbeck- Herrenwyk53.53_46_N 10.48_9_E;Sweden - Kruseberg55.30_1_N 13.8_45_E;262;450;600;1994;Thyr;Supplier:ABB; ;;;(250/12);;;;;; SydVstlnken;Sweden -Barkeryd57.44_52_N 14.39_19_E;Sweden -Hurva55.49_59_N 13.36_08_E;260;300;2x720;2016;IGBT;Supplier:Alstom; ;;;(197/63);;;;;; Cometa;Spain -Morvedre39.38_28_N 0.14_7_W;Spain -Santa Ponsa39.32_2_N 2.30_21_E;247;250;400;2011;Thyr;Expected completion 2011;[38] ;;;(247/0);;;;;"Supplier:Siemens(converter stations);Prysmian/Nexans(cables)"; SwePol;Poland - Wierzbi_cin54.30_8_N 16.53_28_E;Sweden - Strn56.9_11_N 14.50_29_E;245;450;600;2000;Thyr;Supplier:ABB;[36] ;;;(245/0);;;;;; BritNed;UK - Grain51.26_24_N 0.43_0_E;Netherlands - Maasvlakte51.57_27_N 4.01_17_E;245;450;1000;2010;Thyr;Operational since April 2011. Supplier:Siemens;[38][39] ;;;(245/0);;;;;;[40][41] Skagerrak4;Denmark - Tjele56.28_44_N 9.34_1_E;Norway - Kristiansand58.15_36_N 7.53_55_E;244;500;700;2015;IGBT;Suppliers:Nexans,ABB;[67] ;;;(244/0);;;;;; IFA2;France - Tourbe, Normandie;UK -Pilling, Hampshire;240;400;1000;2020;;;[96][97][98] Fenno-Skan;Finland - Rauma61.09_07_N 21.37_32_E;Sweden - Dannebo60.24_14_N 18.08_10_E;233;400;500;1989;Thyr;Supplier:ABB; ;;;(200/33);;;;;; Fenno-Skan 1 Upgrade;Sweden - Finnble;Finland - Rauma;233;400;500;2013;Thyr;Upgrade;[50][51][52] ;;;(200/33);;;;;Supplier:ABB; Skagerrak1 + 2;Denmark - Tjele56.28_44_N 9.34_1_E;Norway - Kristiansand58.15_36_N 7.53_55_E;230;250;500;1977;Thyr; Supplier: STK(Nexans) Control system upgrade byABBin 2007;[32][33][34] ;;;(130/100);;;;;; Skagerrak3;Denmark - Tjele56.28_44_N 9.34_1_E;Norway - Kristiansand58.15_36_N 7.53_55_E;230;350;440;1993;Thyr;Supplier: NexansABB;[32] ;;;(130/100);;;;;; SylWin1;Germany - Bttel53.55_01_N 9.13_55_E;Germany - SylWin Alpha platform55.03_47_N 7.14_28_E;205;320;864;2015;IGBT;Supplier:Siemens;[68] ;;;(205/0);;;;;; Lyon-Moutiers DC transmission scheme;France - Lyon;France - Moutiers;200;75;30;1906;Thury;Dismantled in 1936; ;;;(10/190);;;;;; BorWin1;Germany - Diele;Germany -BorWin Alphaplatform;200;150;400;2012;IGBT;Supplier:ABB;[46][47][48] ;;;(200/0);;;;;; BorWin2;Germany - Diele53.7_30_N 7.18_29_E;Germany - BorWin Beta platform54.21_18_N 6.01_30_E;200;300;800;2015;IGBT;Supplier:Siemens;[56] ;;;(200/0);;;;;; BorWin3;Germany - Diele;Germany - BorWin Gamma platform;200;320;900;2019;IGBT;Supplier:Siemens; ;;;(200/0);;;;;; France-Italy viaFrjus Road Tunnel;France, Grand-le;Italy,Piossasco;190;320;2x600;2019;IGBT;"Supplier:Alstom(converter stations);Prysmian(cables).";[88][89][90][91] Konti-Skan 1;Denmark - Vester Hassing57.3_46_N 10.5_24_E;Sweden - Stenkullen57.48_15_N 12.19_13_E;176;250;250;1965;Merc;Replaced in August 2006 by modern converters using thyristors;[1] ;;;(87/89);;;;;; Estlink2;Estonia - Pssi59.22_13_N 27.04_05_E;Finland - Anttila60.22_36_N 25.22_01_E;171;450;650;2014;Thyr;Supplier:Siemens,Nexans; ;;;(157/14);;;;;; Kontek;Denmark - Bjverskov55.27_1_N 12.0_27_E;Germany -Bentwisch54.6_3_N 12.13_1_E;170;400;600;1996;Thyr;Supplier:ABB; ;;;(170/0);;;;;; DolWin1;Germany - Heede52.58_57_N 7.15_26_E;Germany - DolWin Alpha platform53.59_42_N 6.25_16_E;165;320;800;2015;IGBT;Supplier:ABB;[57] ;;;(165/0);;;;;; LitPol LinkHVDC is B2B;Lithuania - Alytus;Poland - Elk;160;70;500;20152[62];Thyr;Supplier:ABB;[63][64][65] ;;;(0/160);;;;;; DolWin3;Germany - Heede52.58_57_N 7.15_26_E;Germany - DolWin Gamma platform53.59_42_N 6.25_16_E;160;320;900;2017;IGBT;Supplier:Alstom;[76] ;;;(160/0);;;;;; Caithness Moray HVDC3;UK -Spittal;UK -Blackhillock;160;320;1200;2018;;Supplier: ABB;[82][83] L-link;land- Ytterby;Finland -Naantali(sv:Ndendal)60.27_49_N 22.03_49_E;158;80;100;2015;IGBT;Supplier:ABB;[53][54][55] ;;;(158/0);;;;;; Western Isles HVDC;UK - Arnish Point nearStornoway;UK -Beauly;156;320;600;20217;;;[111] Konti-Skan2;Denmark - Vester, Hassing57.3_46_N 10.5_24_E;Sweden - Lindome57.36_24_N 12.6_40_E;147;285;300;1988;Thyr;Supplier:ABB; ;;;(87/60);;;;;; Nemo Link;Belgium - nearBruges;UK -Richborough Energy Park;140;400;1000;2019;IGBT;Converter stations:Siemens, cables: J-power systems[92];[93][94] ;;;(140/0);;;;;; DolWin2;Germany - Heede52.58_52_N 7.15_26_E;Germany - DolWin Beta platform53.58_41_N 6.55_23_E;135;320;900;2016;IGBT;Supplier:ABB;[75] ;;;(135/0);;;;;; East West Interconnector;Ireland - Woodland53.28_16_N 6.34_3_W;UK - Shotton, Wales53.13_38_N 3.4_22_W;130;200;500;2012;IGBT;Supplier:ABB;[49] ;;;(130/0);;;;;; HelWin1;Germany - Bttel53.55_01_N 9.13_55_E;Germany - HelWin Alpha platform54.27_07_N 7.44_20_E;130;250;576;2015;IGBT;Supplier:Siemens;[58] ;;;(130/0);;;;;; HelWin2;Germany - Bttel53.55_01_N 9.13_55_E;Germany - HelWin Beta platform54.27_11_N 7.44_20_E;130;320;690;2015;IGBT;Supplier:Siemens; ;;;(130/0);;;;;; Elbe-Project;Germany,Vockerode51.50_40_N 12.21_50_E;Germany - Berlin, Marienfelde52.25_49_N 13.22_42_E;115;200;60;1945;Merc;Never placed in service; ;;;(115/0);;;;;Dismantled; Kingsnorth;UK - Kingsnorth;UK - London-Willesden51.32_03_N 0.15_29_W;111;266;320;1975;Merc;Opposite pole of Kingsnorth - Beddington. Cable wholly underground except for Thames crossing - crossed on upstream side of PutneyDistrict linerailway bridge; ;;;(111/0);;;;;; Estlink;Estonia - Harku59.23_5_N 24.33_37_E;Finland - Espoo60.12_14_N 24.33_06_E;105;150;350;2006;IGBT;Supplier:ABB;[38] ;;;(105/0);;;;;; MoscowKashira;Russia-Moscow55.39_32_N 37.38_16_E;Russia -Kashira;100;200;30;1951;Merc;Built of parts of HVDCElbe-Project;[1] ;;;(100/0);;;;;Shut down; ALEGrO;Belgium -Vis;Germany -Aachen;100;320;1000;2019-205;IGBT;;[95] ;;;(100/0);;;;;; Gotland2;Sweden - Vstervik57.43_41_N 16.38_51_E;Sweden - Yigne57.35_13_N 18.11_44_E;99.5;150;130;1983;Thyr;; ;;;(92.9/6.6);;;;;; Gotland 1;Sweden - Vstervik57.43_41_N 16.38_51_E;Sweden - Yigne57.35_13_N 18.11_44_E;98;200;20;1954;Merc;World's first commercial HVDC link. Expanded byABBin1970, decommissioned in 1986;[1][30] ;;;(98/0);;;;;; Gotland3;Sweden - Vstervik57.43_41_N 16.38_51_E;Sweden - Yigne57.35_13_N 18.11_44_E;98;150;130;1987;Thyr;; ;;;(98/0);;;;;; Kingsnorth;UK - Kingsnorth51.25_11_N 0.35_46_E;UK - London-Beddington51.22_23_N 0.7_38_W;85;266;320;1975;Merc;Bipolar scheme;[31] ;;;(85/0);;;;;Supplier:English ElectricShut down in 1987; Interconnexion France Angleterre(new);France - Les Mandarins50.54_11_N 1.47_5_E;UK -Sellindge51.6_21_N 0.58_32_E;72;270;2000;1986;Thyr;2 bipolar systems;[1][35] ;;;(72/0);;;;;Supplier:Alstom; Visby-Nas;Sweden - Nas57.05_58_N 18.14_27_E;Sweden - Visby57.37_29_N 18.21_18_E;70;80;50;1999;Thyr;; ;;;(70/0);;;;;; HVDC Troll;Norway - Kollsnes60.33_01_N 4.50_26_E;Norway - Offshore platformTroll A60.40_00_N 3.40_00_E;70;60;80;2004;IGBT;Power supply for offshore gas compressor;[38] ;;;(70/0);;;;;Supplier:ABB; Troll A 3&4;Norway - Kollsnes;Norway - Troll A 3&4 platform;70;66;100;2015;IGBT;Supplier:ABB;[69][70][71][72][73][74] ;;;(70/0);;;;;; ElecLink;France - Les Mandarins;UK -Sellindge;70;320;1000;2019;;;[87] Cross-Channel;France - Echingen50.41_48_N 1.38_21_E;UK - Lydd50.54_54_N 0.56_50_E;64;100;160;1961;Merc;Shut down in 1984;[1] ;;;(64/0);;;;;; INELEF;France - Baixas42.43_56_N 2.48_14_E;Spain - Santa Llogaia42.13_59_N 2.56_39_E;64;320;2000;2015;IGBT;Supplier:Siemens, Cables: Prysmian;[59] ;;;(64/0);;;;;;[60][61] Moyle;UK - Auchencrosh55.04_10_N 4.58_50_W;UK - N. Ireland- Ballycronan More54.50_34_N 5.46_11_W;63.5;250;2501;2001;Thyr;Supplier:Siemens,Nexans;[37] ;;;(63.5/0);;;;;; Miesbach-Munich Power Transmission;Germany - Miesbach;Germany - Munich;58;2;0.0025;1882;Single machine;Demonstration facility; ;;;(0/58);;;;;Dismantled; StoreBlt;Denmark - Fraugde55.22_01_N 10.30_25_E;Denmark - Herslev55.31_53_N 11.19_01_E;56;400;600;2010;Thyr;Operational since August 2010. Supplier:Siemens;[38] ;;;(56/0);;;;;; HVDC Trollhattan-Merud;Sweden - Trollhattan;Sweden - Merud;50;45;6.5;1946;Merc;Experimental facility built by ASEA; ;;;(0/50);;;;;Dismantled; HVDC Zurich-Wettingen;Switzerland - Wettingen47.27_25_N 8.19_15_E;Switzerland - Zurich;20;50;0.5;1939;Merc;Experimental facility built byBBC; ;;;(0/20);;;;;Dismantled; Hellsjn-Grngesberg;Sweden - Hellsjn60.02_50_N 15.08_52_E;Sweden - Grngesberg60.03_53_N 14.59_39_E;10;180;3;1997;IGBT;Experimental HVDC; ;;;(0/10);;;;;Supplier:ABB; HVDC Charlottenburg-Moabit;Germany - Berlin-Moabit;Germany - Berlin-Charlottenburg;4.6;100;14;1942;Merc;Experimental facility built by Siemens; ;;;(0/4.6);;;;;Dismantled in 1945; Tjreborg;Denmark - Tjreborg/Enge55.26_52_N 8.35_34_E;Denmark - Tjreborg/Substation55.28_07_N 8.33_36_E;4.3;9;7;2000;IGBT;Interconnection to wind power generating stations; ;;;(4.3/0);;;;;; Gorzente River - Genoa DC transmission scheme;Italy - Gorzente River;Italy - Genoa;?;6;?;1889;Thury;Upgraded later to a voltage of 14 kV, power of 2.5 MW and a length of 120km; ;;;;;;;;Dismantled; La Chaux-de-Fonds DC transmission scheme;Switzerland -?;Switzerland -?;?;14;?;1897;Thury;Dismantled; St. Maurice - Lausanne DC transmission scheme;Switzerland - St. Maurice;Switzerland - Lausanne;?;22;3.7;1899;Thury;Dismantled; Wilesden-Ironbridge DC transmission scheme;UK - Wilesden;UK - Ironbridge;?;100;?;1910;Thury;Dismantled; Chambry DC transmission scheme;France -?;France -?;?;150;?;1925;Thury;Dismantled in 1937; Lehrte-Misburg HVDC;Germany - Lehrte52.22_54_N 9.55_03_E;Germany - Hannover/Misburg;?;80;16;1944;Merc;Experimental facility; ;;;;;;;;Dismantled; FAB Link;France - Menuel onCherbourg Peninsula;UK -ExeterviaAlderney;;;1000/1400;2021;;;[106][107]