Trigger, Description, Definition, Status ``nH``; i.e. ``2H``-``6H``, Resample the time-resolution by averaging over every ``n`` snapshots, ``prepare_network``: `average_every_nhours() `_ and its `caller `__), In active use ``nSEG``; e.g. ``4380SEG``, "Apply time series segmentation with `tsam `_ package to ``n`` adjacent snapshots of varying lengths based on capacity factors of varying renewables, hydro inflow and load.", ``prepare_network``: apply_time_segmentation(), In active use ``Co2L``, Add an overall absolute carbon-dioxide emissions limit configured in ``electricity: co2limit``. If a float is appended an overall emission limit relative to the emission level given in ``electricity: co2base`` is added (e.g. ``Co2L0.05`` limits emissisions to 5% of what is given in ``electricity: co2base``), ``prepare_network``: `add_co2limit() `_ and its `caller `__, In active use ``Ep``, Add cost for a carbon-dioxide price configured in ``costs: emission_prices: co2`` to ``marginal_cost`` of generators (other emission types listed in ``network.carriers`` possible as well), ``prepare_network``: `add_emission_prices() `_ and its `caller `__, In active use ``CCL``, Add minimum and maximum levels of generator nominal capacity per carrier for individual countries. These can be specified in the file linked at ``electricity: agg_p_nom_limits`` in the configuration. File defaults to ``data/agg_p_nom_minmax.csv``., ``solve_network``, In active use ``EQ``, "Require each country or node to on average produce a minimal share of its total consumption itself. Example: ``EQ0.5c`` demands each country to produce on average at least 50% of its consumption; ``EQ0.5`` demands each node to produce on average at least 50% of its consumption.", ``solve_network``, In active use ``ATK``, "Require each node to be autarkic. Example: ``ATK`` removes all lines and links. ``ATKc`` removes all cross-border lines and links.", ``prepare_network``, In active use ``BAU``, Add a per-``carrier`` minimal overall capacity; i.e. at least ``40GW`` of ``OCGT`` in Europe; configured in ``electricity: BAU_mincapacities``, ``solve_network``: `add_opts_constraints() `__, Untested ``SAFE``, Add a capacity reserve margin of a certain fraction above the peak demand to which renewable generators and storage do *not* contribute. Ignores network., ``solve_network`` `add_opts_constraints() `__, Untested ``carrier+{c|p}factor``, "Alter the capital cost (``c``) or installable potential (``p``) of a carrier by a factor. Example: ``solar+c0.5`` reduces the capital cost of solar to 50\% of original values.", ``prepare_network``, In active use