########################################## Preparing Networks ########################################## The preparation process of the PyPSA-Eur energy system model consists of a group of ``snakemake`` rules which are briefly outlined and explained in detail in the sections below: - ``build_shapes`` to generate GeoJSON files with shapes of the countries, exclusive economic zones and `NUTS3 `_ areas. - ``build_cutout`` to prepare smaller weather data portions from `ERA5 `_ for cutout ``europe-2013-era5`` and SARAH for cutout ``europe-2013-sarah``. With these and the externally extracted ENTSO-E online map topology (``data/entsoegridkit``), it can build a base ``PyPSA`` network with the following rules: - ``base_network`` builds and stores the base network with all buses, HVAC lines and HVDC links, while - ``build_bus_regions`` determines `Voronoi cells `_ for all substations. Then the process continues by calculating conventional power plant capacities, potentials, and per-unit availability time series for variable renewable energy carriers and hydro power plants with the following rules: - ``build_powerplants`` for today's thermal power plant capacities using `powerplantmatching `_ allocating these to the closest substation for each powerplant, - ``build_renewable_potentials`` for the installation potentials for solar panels, onshore and offshore wind turbines constrained by landuse restrictions and natural protection areas, - ``build_renewable_profiles`` for the hourly capacity factors in each substation's Voronoi cell for PV, onshore and offshore wind, and - ``build_hydro_profile`` for the hourly per-unit hydro power availability time series. The central rule ``add_electricity`` then ties all the different data inputs together into a detailed `PyPSA` network stored in ``networks/elec.nc`` containing .. todo:: probably move parts into ``add_electricity`` docstring - today's transmission topology and transfer capacities (optionally including lines which are under construction according to the config settings ``lines: under_construction`` and ``links: under_construction``), - today's thermal and hydro power generation capacities (for the technologies listed in the config setting ``electricity: conventional_carriers``), and - today's load time-series (upsampled in a top-down approach according to population and gross domestic product) It further adds extendable ``generators`` and ``storage_units`` with **zero** capacity for - photovoltaic, onshore and offshore wind installations with today's locational, hourly wind and solar pv capacity factors (but **no** current capacities) - long-term hydrogen and short-term battery storage units (if listed in the config setting ``electricity: extendable_carriers``) - additional open- and combined-cycle gas turbines (if ``OCGT`` and/or ``CCGT`` is listed in the config setting ``electricity: extendable_carriers``) .. each rule description should have a list of parameters .. from the config.yaml that affect this rule. Build Shapes ============================= .. automodule:: build_shapes Build Cutout ============================= .. automodule:: build_cutout Prepare HVDC Links ============================= .. automodule:: prepare_links_p_nom Base Network ============================= .. automodule:: base_network Build Bus Regions ============================= .. automodule:: build_bus_regions Build Country Full Load Hours ============================= .. automodule:: build_country_flh Build Hydro Profile ============================= .. automodule:: build_hydro_profile Build Natura Raster ============================= .. automodule:: build_natura_raster Build Renewable Profiles ======================== .. automodule:: build_renewable_profiles Build Power Plants ============================= .. automodule:: build_powerplants Add Electricity ============================= .. automodule:: add_electricity