run: test-myopic # use this to keep track of runs with different settings foresight: myopic # options are overnight, myopic, perfect (perfect is not yet implemented) scenario: lv: # allowed transmission line volume expansion, can be any float >= 1.0 (today) or "opt" - 1.5 clusters: # number of nodes in Europe, any integer between 37 (1 node per country-zone) and several hundred - 5 sector_opts: # this is where the main scenario settings are - 191H-T-H-B-I-A-solar+p3-dist1 planning_horizons: # investment years for myopic and perfect; or costs year for overnight - 2030 - 2040 - 2050 snapshots: # arguments to pd.date_range start: "2013-03-01" end: "2013-04-01" inclusive: left # end is not inclusive atlite: cutout: ../pypsa-eur/cutouts/be-03-2013-era5.nc existing_capacities: grouping_years: [1980, 1985, 1990, 1995, 2000, 2005, 2010, 2015, 2019] sector: co2_vent: true SMR: true regional_co2_sequestration_potential: enable: false co2_sequestration_potential: 200 #MtCO2/a sequestration potential for Europe co2_sequestration_cost: 10 #EUR/tCO2 for sequestration of CO2 co2_network: false cc_fraction: 0.9 # default fraction of CO2 captured with post-combustion capture hydrogen_underground_storage: true hydrogen_underground_storage_locations: # - onshore # more than 50 km from sea - nearshore # within 50 km of sea # - offshore use_fischer_tropsch_waste_heat: true use_fuel_cell_waste_heat: true electricity_distribution_grid: true electricity_distribution_grid_cost_factor: 1.0 #multiplies cost in data/costs.csv electricity_grid_connection: true # only applies to onshore wind and utility PV H2_network: true gas_network: false H2_retrofit: false # if set to True existing gas pipes can be retrofitted to H2 pipes # according to hydrogen backbone strategy (April, 2020) p.15 # https://gasforclimate2050.eu/wp-content/uploads/2020/07/2020_European-Hydrogen-Backbone_Report.pdf # 60% of original natural gas capacity could be used in cost-optimal case as H2 capacity H2_retrofit_capacity_per_CH4: 0.6 # ratio for H2 capacity per original CH4 capacity of retrofitted pipelines gas_network_connectivity_upgrade: 1 # https://networkx.org/documentation/stable/reference/algorithms/generated/networkx.algorithms.connectivity.edge_augmentation.k_edge_augmentation.html#networkx.algorithms.connectivity.edge_augmentation.k_edge_augmentation gas_distribution_grid: true gas_distribution_grid_cost_factor: 1.0 #multiplies cost in data/costs.csv biomass_transport: false # biomass transport between nodes conventional_generation: # generator : carrier OCGT: gas biomass_boiler: false biomass_to_liquid: false biosng: false industry: St_primary_fraction: # 0.3 # fraction of steel produced via primary route versus secondary route (scrap+EAF); today fraction is 0.6 2020: 0.6 2025: 0.55 2030: 0.5 2035: 0.45 2040: 0.4 2045: 0.35 2050: 0.3 DRI_fraction: # 1 # fraction of the primary route converted to DRI + EAF 2020: 0 2025: 0 2030: 0.05 2035: 0.2 2040: 0.4 2045: 0.7 2050: 1 H2_DRI: 1.7 #H2 consumption in Direct Reduced Iron (DRI), MWh_H2,LHV/ton_Steel from 51kgH2/tSt in Vogl et al (2018) doi:10.1016/j.jclepro.2018.08.279 elec_DRI: 0.322 #electricity consumption in Direct Reduced Iron (DRI) shaft, MWh/tSt HYBRIT brochure https://ssabwebsitecdn.azureedge.net/-/media/hybrit/files/hybrit_brochure.pdf Al_primary_fraction: # 0.2 # fraction of aluminium produced via the primary route versus scrap; today fraction is 0.4 2020: 0.4 2025: 0.375 2030: 0.35 2035: 0.325 2040: 0.3 2045: 0.25 2050: 0.2 MWh_CH4_per_tNH3_SMR: 10.8 # 2012's demand from https://ec.europa.eu/docsroom/documents/4165/attachments/1/translations/en/renditions/pdf MWh_elec_per_tNH3_SMR: 0.7 # same source, assuming 94-6% split methane-elec of total energy demand 11.5 MWh/tNH3 MWh_H2_per_tNH3_electrolysis: 6.5 # from https://doi.org/10.1016/j.joule.2018.04.017, around 0.197 tH2/tHN3 (>3/17 since some H2 lost and used for energy) MWh_elec_per_tNH3_electrolysis: 1.17 # from https://doi.org/10.1016/j.joule.2018.04.017 Table 13 (air separation and HB) NH3_process_emissions: 24.5 # in MtCO2/a from SMR for H2 production for NH3 from UNFCCC for 2015 for EU28 petrochemical_process_emissions: 25.5 # in MtCO2/a for petrochemical and other from UNFCCC for 2015 for EU28 HVC_primary_fraction: 1. # fraction of today's HVC produced via primary route HVC_mechanical_recycling_fraction: 0. # fraction of today's HVC produced via mechanical recycling HVC_chemical_recycling_fraction: 0. # fraction of today's HVC produced via chemical recycling HVC_production_today: 52. # MtHVC/a from DECHEMA (2017), Figure 16, page 107; includes ethylene, propylene and BTX MWh_elec_per_tHVC_mechanical_recycling: 0.547 # from SI of https://doi.org/10.1016/j.resconrec.2020.105010, Table S5, for HDPE, PP, PS, PET. LDPE would be 0.756. MWh_elec_per_tHVC_chemical_recycling: 6.9 # Material Economics (2019), page 125; based on pyrolysis and electric steam cracking chlorine_production_today: 9.58 # MtCl/a from DECHEMA (2017), Table 7, page 43 MWh_elec_per_tCl: 3.6 # DECHEMA (2017), Table 6, page 43 MWh_H2_per_tCl: -0.9372 # DECHEMA (2017), page 43; negative since hydrogen produced in chloralkali process methanol_production_today: 1.5 # MtMeOH/a from DECHEMA (2017), page 62 MWh_elec_per_tMeOH: 0.167 # DECHEMA (2017), Table 14, page 65 MWh_CH4_per_tMeOH: 10.25 # DECHEMA (2017), Table 14, page 65 hotmaps_locate_missing: false reference_year: 2015 # references: # DECHEMA (2017): https://dechema.de/dechema_media/Downloads/Positionspapiere/Technology_study_Low_carbon_energy_and_feedstock_for_the_European_chemical_industry-p-20002750.pdf # Material Economics (2019): https://materialeconomics.com/latest-updates/industrial-transformation-2050 costs: year: 2030 version: v0.5.0 lifetime: 25 #default lifetime # From a Lion Hirth paper, also reflects average of Noothout et al 2016 discountrate: 0.07 # [EUR/USD] ECB: https://www.ecb.europa.eu/stats/exchange/eurofxref/html/eurofxref-graph-usd.en.html # noqa: E501 USD2013_to_EUR2013: 0.7532 # Marginal and capital costs can be overwritten # capital_cost: # onwind: 500 marginal_cost: solar: 0.01 onwind: 0.015 offwind: 0.015 hydro: 0. H2: 0. battery: 0. emission_prices: # only used with the option Ep (emission prices) co2: 0. lines: length_factor: 1.25 #to estimate offwind connection costs solving: solver: name: cbc options: cbc-default mem: 4000 #memory in MB; 20 GB enough for 50+B+I+H2; 100 GB for 181+B+I+H2