diff --git a/doc/supply_demand.rst b/doc/supply_demand.rst index 2a4d6fee..888c066f 100644 --- a/doc/supply_demand.rst +++ b/doc/supply_demand.rst @@ -164,10 +164,10 @@ Activated in Config from the `tes `_. A thermal energy density of 46.8 kWhth/m3 is assumed, corresponding to a temperature difference of 40 K. The decay of thermal energy in the stores: 1-exp(-1/24τ) is assumed to have a time constant of  t=180 days for central TES and  t=3 days for individual TES, both modifiable through `tes_tau `_ in Config file. Charging and discharging efficiencies are 90% due to pipe losses. -*Retrofitting of the thermal envelope of buildings* +**Retrofitting of the thermal envelope of buildings** Co-optimising building renovation is only enabled if in the `config `_ file. To reduce the computational burden, -default setting is set as false +default setting is set as false. Renovation of the thermal envelope reduces the space heating demand and is optimised at each node for every heat bus. Renovation measures through additional