From ab71254aeb3fb5afc33de7cda419853251bc6c5f Mon Sep 17 00:00:00 2001 From: martavp <30744159+martavp@users.noreply.github.com> Date: Mon, 21 Nov 2022 18:11:03 +0100 Subject: [PATCH] Update doc/spatial_resolution.rst Co-authored-by: energyLS <89515385+energyLS@users.noreply.github.com> --- doc/spatial_resolution.rst | 2 +- 1 file changed, 1 insertion(+), 1 deletion(-) diff --git a/doc/spatial_resolution.rst b/doc/spatial_resolution.rst index 3df4dc28..9b0f9f4c 100644 --- a/doc/spatial_resolution.rst +++ b/doc/spatial_resolution.rst @@ -34,7 +34,7 @@ Here are some examples of how spatial resolution is set for different sectors in • Methane network: It can be modeled as a single node for Europe or it can be nodally resolved if activated in the `config `_. One node can be considered reasonable since future demand is expected to be low and no bottlenecks are expected. Also, the nodally resolved methane grid is based on SciGRID_gas data. -• Solid biomass: It can be modeled as a single node for Europe or it can be nodally resolved if activated in the `config file `_. Nodal modeling includes modeling biomass potential per country (given per country, then distributed by population density within) and the transport of solid biomass between countries. +• Solid biomass: It can be modeled as a single node for Europe or it can be nodally resolved if activated in the `config `_. Nodal modeling includes modeling biomass potential per country (given per country, then distributed by population density within) and the transport of solid biomass between countries. • CO2: It can be modeled as a single node for Europe or it can be nodally resolved with CO2 transport pipelines if activated in the `config file `_ . It should mentioned that in single node mode a transport and storage cost is added for sequestered CO2, the cost of which can be adjusted in the `Config `_ file.